Barranca Diamond MK-100 TILE SAW User Manual

Page 33

Advertising
background image

33

MK-100

MAINTENANCE

Cooling Flow

(A)

Check cooling flow Adjusting

Clamp open.

(B)

Remove the Cooling

Transfer Tube from the

Blade Guard inlet.

(C)

Place Pump into a bucket of

water and check flow.

(D)

Remove the Cooling Transfer

Tube and check flow.

(E)

Inspect and clean pump.

See Pump Manual.

(F)

Remove the Blade Guard

Intake Fitting and check.

"Rodding" cooling channels is performed by inserting a small wire rod through the

cooling inlet on top of the Blade Guard and directing the rod out through each of the

cooling flow tubes located on the underside of the Blade Guard. The cooling channels

should be "rodded" until all ports are free of foreign debris.

NOTE:

(G)

Remove the Cooling

Channel cover screws.

(H)

Rod Cooling Channels

and recheck flow.

Advertising