1 prior to applying power, 2 apply power, 3 perform setup – CiDRA Sonar Process Monitoring System User Manual

Page 23: 4 verify proper operation, Prior to applying power -1, 2 apply, Power -1, 3 perform, Setup -1, Verify proper operation -1

Advertising
background image

9

SUPPLEMENTARY INSTRUCTIONS FOR SAFELY
PUTTING INTO SERVICE

9.1

Prior to Applying Power

Perform a final inspection of the installation. Use the installation
instructions and the Control Drawing to aid in the inspection.

Verify the absence of condensation or frost inside the enclosures.

Verify the customer input / output connections are made properly and
are connected to remote circuits operating within the allowed ranges
of voltage and current (refer to Table 3).

Verify that Sensor #1 and #2 inputs (if used) are connected to passive
(not active) 4-20mA transducers (reference Table 4).

9.2

Apply Power

Apply power and verify a normal startup sequence as defined in the
main Installation and Startup manual. If the startup sequence is
abnormal, then remove power until ready to perform troubleshooting.

9.3

Perform Setup

Perform the system setup procedures as defined in the main manual.

9.4

Verify Proper Operation

Verify proper operation of the sonar process monitoring system and its
configuration prior to using the system as a feedback element in a
process control loop.

20909-01C Rev 04

Page 9-1