7

9.1

95-8616

DETECTOR INSTAllATION

3/4" nPT Models
3/4" NPT models have Tapered Threads and no Lock

Nut. Install the sensor as follows:

1. Screw the detector into the appropriate entry on

the termination box. Ensure a minimum of 5 fully

engaged threads. Use of teflon tape on NPT threads

is recommended to prevent thread damage.

2. When the detector gets tight, note the position of the

LEDs, GND lug and calibration notch and adjust the

detector as required so that the LEDs will be easily

visible.

M25 Models
M25 models have Straight Threads and a Lock Nut.

Install the detector as follows:

1. Screw the detector lock nut as far back as it will go,

then screw the detector into the appropriate entry

on the termination box. Ensure a minimum of 7 fully

engaged threads.

2. With the detector in the desired position (LEDs

visible as shown in Figure 5), tighten the lock nut

against the termination box to hold the detector

securely in place.

3. Tighten the set screws (minimum of two) to prevent

movement of the lock nut. See Figure 6.

SEnSoR TERMInATIon box
A Det-Tronics sensor termination box (Model STB)

is required for installing the sensor in a stand alone

configuration, or for installing the GT3000 remotely

from the UD10/UD20 Universal Display Unit.

When installing the GT3000 remotely from a UD10/

UD20, two-conductor shielded cable is required to

prevent possible nuisance EMI/RFI. The maximum

cable length between the GT3000 and the UD10/UD20

is 2000 ft.

WirinG

PowER SUPPLY REqUIREMEnTS
Calculate the total gas detection system power

consumption rate in watts from cold start-up. Select a

power supply with adequate capability for the calculated

load. Ensure that the selected power supply provides

sufficient regulated and filtered output power for the

entire system. If a back-up power system is required, a

float-type battery charging system is recommended. If

an existing source of power is being utilized, verify that

system requirements are met.

NoTe

The power supply must also meet the noise
requirements for HART systems.

wIRIng CAbLE REqUIREMEnTS
Always use proper cabling type and diameter for input

power as well as output signal wiring. 22 to 14 AWG

shielded stranded copper wire is recommended.

Always install a properly sized, master power fuse or

breaker on the system power circuit.

NoTe

The use of shielded cable in conduit or shielded
armored cable is highly recommended. In
applications where the wiring is installed in
conduit, dedicated conduit is recommended.
Avoid low frequency, high voltage, and
non‑signaling conductors to prevent nuisance
eMI problems.

CaUtIon

The use of proper conduit installation techniques,
breathers, glands, and seals is required to prevent
water ingress and/or maintain the explosion‑proof
rating.

Set Screws

Figure 6—Location of Lock Nut and Set Screws

(Metric Models Only)