Elkhart Brass HEROPipe System Manual User Manual

Page 13

Advertising
background image

13

Docking Station Feedback

Initial power up – When the battery charger is first powered on the green LED will illuminate for

approximately ½ second and then turn off. Then the red LED will repeat the same
on/off cycle as the green, and finally the blue LED will do the same.

Blue LED is on solid – Power is applied to the charging station and no battery is attached
Green LED is on solid – Lithium Battery is fully charged
Blinking green LED – Lithium battery is in its final charging stage (1/10 C)
Blinking red LED – Lithium Battery is accepting full charge rate.
Rapid blinking red LED – Charging station has unsuccessfully tried to charge the lithium battery


B. Manual Override

In the event of power failure, the monitor and nozzle may be actuated manually, but only while the monitor
in NOT elevated. To operate a function manually, simply apply a ¾” ratcheting type wrench (either socket
type or ratcheting box end type) to the hex fitting on the motor shaft extension.

Caution: Do not use any power tools to operate the manual override nuts. Serious damage to

the motor gear heads will result.

Caution: All

SIDEWINDER™

EXM monitor motors are 12VDC.





V.

NOZZLE FLOW CHART

Nozzles

6000 series; 700E

Smooth Bore

Settings

Press

ure

1 3/8"

1 1/2"

250

350

500

700

PSI

(BAR)

GPM

(LPM)

8ft

(2.44m)

ceili

ng

ht.

Effectiv

e R

eac

h

Ft

(m)

80

(5.51)

500

(1893)

600

(2271)

225

(852)

315

(1192)

450

(1703)

625

(2366)

140

(42.7)

Minimum 3" hose required to supply The HEROPipe™ System

Table 1: Nozzle Flow Chart








Advertising