Installation instructions continued – Bradley Brand Furniture TBD3103 User Manual

Page 12

Advertising
background image

TDB3103, WF3203

Installation

12

3-5-08

Bradley Corporation • 215-1332 Rev. T; EN 08-009

3/8" TUBING FROM SPRAYHEAD

VOLUME CONTROL

TIE ROD

TIE ROD NUT 110-064

CHECK STOP

S27-102

CHECK STOP
S27-102

ELBOW
169-639

ELBOW
169-639

HOT

COLD

FLEXIBLE HOSE 269-1735

I.R. VALVE WITH TEMPERED LINE

NOT SHOWN

(S45-2234)

I.R. VALVE WITH THERMOSTATIC

MIXING VALVE (SHOWN) S45-2233

(DO NOT APPLY PIPE SEALANT
TO COMPRESSION FITTINGS)

Figure 9a

Installation Instructions continued . . .

3/8" TUBING FROM SPRAYHEAD

INFRARED MODULE
S50-403 (36" BOWL)
S50-367 (54" BOWL)

SOLENOID VALVE

24 VAC

TRANSFORMER

S83-134

I.R. VALVE WITH

THERMOSTATIC MIXING VALVE

(SHOWN) S45-2233

I.R. VALVE WITH TEMPERED LINE

(NOT SHOWN) S45-2234

MALE CONNECT

FEMALE CONNECT

INFRARED MODULE

FEMALE CONNECT WIRE

(DO NOT APPLY PIPE SEALANT
TO COMPRESSION FITTINGS)

Figure 9b

S50-367

Advertising
This manual is related to the following products: