Elkhart Brass UBEC 1C Valve Controller User Manual

Page 6

Advertising
background image

6

III INSTALLATION INSTRUCTIONS

A. Installation Steps

1. UBEC 1C and UBEC 1S controllers are surface mountable. Therefore, only mounting holes and

wire access holes are necessary for installation. Measure and mark mounting location for wire

cutout and mounting screw holes. Make sure there is clearance for the controller before drilling the

holes. Please refer to Figure 7 on page 16.

2. Drill or cut the 1 inch wire access hole and the clearance holes for #8-32 mounting holes.

3. Place the control module in position and secure with #8-32 mounting screws. It is recommended

that a lock washer is used on the back side of the panel to ensure the mounting screws do not loosen.

4. Connect and secure the wires. (See wiring recommendations below & fuse specs on page 14)

a. UBEC 1S: Connect power and ground to the controller & valve. Connect valve function leads

from the controller to the valve. (Figure 5 on next page)

b. UBEC 1C: For a single controller setup see Figure 6 on next page.

c. UBEC 1C: For system with multiple controllers or valves that share the CAN line.

Connect power & ground to the controller(s) and valve(s).

Connect CAN wiring from the first to the last component using a CAN Connector Kit (P/N

37221001) at each of the components in between the first and last.

The distance from the CAN Connector Kit to the components that are not at either end of the

main CAN line must not exceed 3 ft. Distances from CAN Connector Kits to each other or to

the components at the ends of the main CAN line should not exceed 500 ft. when added

together.

When done there should be continuity between all CAN LOW contacts (Green wires in

connector position A), CAN HIGH contacts (Blue wires in connector position B), and CAN

SHIELD contacts (Black wires in connector position C) throughout the entire CAN

communication wiring harness.

5. Power up the controller and initiate Automatic Valve Position Calibration. (See Automatic Valve

Position Calibration)

B. Wiring Recommendations

UBEC 1S all wiring / UBEC 1C power & ground:

Wire gauge & length:

Distance (Ft)

Wire Gauge (AWG)

0-150

18

Wire type: Cross Link or equivalent (Must meet or exceed NFPA 1901 Section 13)

UBEC 1C CAN wiring (Green, Blue, & Black):

CAN wire gauge/length:

Distance (Ft)

Wire Gauge (AWG)

0-500

22

Advertising
This manual is related to the following products: