Powering up, Initializing the system, Powering up 6.13. initializing the system – ElmoMC Gold Line Digital Servo Drives-Gold DC Bell User Manual
Page 59
Advertising
![background image](/manuals/558336/59/background.png)
Gold DC Bell Installation Guide
MAN-G-DCBELIG-EC (Ver. 1.200)
||Powering Up
59
6.12. Powering Up
After the Gold DC Bell is connected to its device, it is ready to be powered up.
Caution:
Before applying power, ensure that the DC supply is within the specified range
and that the proper plus-minus connections are in order.
6.13. Initializing the System
After the Gold DC Bell has been connected and mounted, the system must be set up and initialized.
This is accomplished using the EASII, Elmo’s Windows-based software application. Install the
application and then perform setup and initialization according to the directions in the EASII User
Manual.
Advertising