2 step 2: defining the properties of the master – Lenze Global Drive Cam Loader User Manual

Page 26

Advertising
background image

Global Drive Cam Loader

Operation

Creating a new project

26

1.1 EN - 05/2005

L

X

How to define the file name and directory for a new project...

1. Go to the New project dialog box and click the Project save as button to open the

Save as dialog box.

2. Go to the Save as dialog box and select the directory in which you want to store the

new project.

3. Go to the File name input field and enter a name for the new project.
4. Click OK to confirm the settings for the new project and close the Save as dialog

box.

5. Go to the New project dialog box and click Next to proceed with the next step.

6.1.2

Step 2: Defining the properties of the master

X

How to define the properties of the master...

1. Go to the Master dialog box and select the properties of the master.

• The Name of the master is indicated on your worksheet.
• The Cycles are the maximum number of operating cycles per minute.

2. Click Next to proceed with the next step.

Advertising