Vertical seam – Metal Sales Vertical Seam Installation User Manual

Page 11

Advertising
background image

800.406.7387 • www.metalsales.us.com

© Metal Sales Manufacturing Corporation Subject to change without notice Effective Date 5/13

11

VERTICAL SEAM

To facilitate the handling of Vertical Seam panels, panel bundles may be lifted and placed on the roof. Loading capabilities of the

roof structure must be checked. Bundles need to be placed on the roof in areas that the roof structure can handle the weight.

When lifting packaged sheets, make certain they are adequately supported. Panels less than 20'-0" in length can normally be lifted

with a forklift; however, when lifting panels in excess of 20'-0", it is recommended that a spreader bar and slings be used. As a

rule, when lifting, no more than

1

/

3

of the length of the panel should be left unsupported.

Make a plan for bundle placement by determining how much area a bundle of panels will cover. Bundles should be placed on the

roof in accordance with the direction the panel will be installed. Consider where the string line, if any, is to run at the eave to set

roof panels by. Roof bundles should not interfere with this string line.

S

torage

(

cont

.)

STORAGE ON ROOF

Spreader Bar

Vertical Seam Panels

Open Framing

Wood Blocking

Advertising