Vertical seam – Metal Sales Vertical Seam Installation User Manual

Page 43

Advertising
background image

800.406.7387 • www.metalsales.us.com

© Metal Sales Manufacturing Corporation Subject to change without notice Effective Date 5/13

43

VERTICAL SEAM

r

ake

p

arapet

(o

ff

m

odule

) o

ver

o

pen

f

ramIng

Double Bead Tape Sealant

Fastener (by others)

Tube Sealant

Counter Flashing

Rakewall

#12-14 x 1

1

/

4

" Shoulder SD (1'-0" o.c.)

#12-14 x 1

1

/

4

" SD XL (1'-0" o.c.)

1

/

8

x

3

/

16

" Pop Rivet (1'-0" o.c.)

Rake Cleat

Floating Rake Angle

Vertical Seam panels must be installed prior to Rake installation (see pages 34-35).

1. Field cut and bend off module panel up 1

3

/

4

"

2. Apply a row of Double Bead of Tape Sealant to vertical leg of Vertical Seam panel.

3. Position and install Rake Cleat through panel and into the Floating Rake Angle with #12-14 x 1

1

/

4

" Self Driller XL, 1'-0" o.c.

4. Apply a row of Double Bead Tape Sealant to top leg of Rake Cleat.

5. Install Rakewall to the Rake Cleat with

1

/

8

" x

3

/

16

" Pop Rivets at 1'-0" o.c. Do NOT fasten Rakewall to parapet wall.

6. Install Counter Flashing, Reglet, or wall panel and fasten to parapet wall with appropriate fastener 1'-0" o.c. If Counter

Flashing or Reglet is used, seal to parapet wall with Tube Sealant. Do NOT fasten Rakewall to wall.

7. If two or more flashings are required, lap the flashing over the previously installed flashing by a minimum of 2" placing a bead

of Tube Sealant between the flashings and securing with pop rivets 2

1

/

2

" o.c.

• Field bend Panel rib up 1

3

/

4

"

Vertical Seam Panel

3:12 Slope

Minimum

INSTALLATION NOTES

Advertising