VERTICAL SEAM

r

ake

p

arapet

(o

ff

m

odule

) o

ver

d

eckIng

Double Bead Tape Sealant

Fastener (by others)

Tube Sealant

Counter Flashing

Rakewall

#12-14 x 1

1

/

4

" Shoulder SD (1'-0" o.c.)

#12-14 x 1

1

/

4

" SD XL (1'-0" o.c.)

1

/

8

x

3

/

16

" Pop Rivet (1'-0" o.c.)

Rake Cleat

Floating Rake Angle

Vertical Seam panels must be installed prior to rake installation (see pages 20-21).

1. Field cut and bend off module panel up 1

3

/

4

"

2. Apply a row of Double Bead of Tape Sealant to vertical leg of Vertical Seam panel.

3. Position and install Rake Cleat through panel and into the Floating Rake Angle with #12-14 x 1

1

/

4

" Self Driller XL, 1'-0" o.c.

4. Apply a row of Double Bead Tape Sealant to top leg of Rake Cleat.

5. Install Rakewall to the Rake Cleat with

1

/

8

"x

3

/

16

" Pop Rivets at 1'-0" o.c. Do NOT fasten Rakewall to parapet wall.

6. Install Counter Flashing, Reglet, or wall panel and fasten to parapet wall with appropriate fastener 1'-0" o.c. If Counter

Flashing or Reglet is used, seal to parapet wall with Tube Sealant. Do NOT fasten Rakewall to wall.

7. If two or more flashings are required, lap the flashing over the previously installed flashing by a minimum of 2" placing a bead

of Tube Sealant between the flashings and securing with pop rivets 2

1

/

2

" o.c.

INSTALLATION NOTES

• Field bend panel rib up 1

3

/

4

"

1:12 Slope

Minimum

over Solid

Substrate