Vertical seam, 11" r – Metal Sales Vertical Seam Installation User Manual

Page 30

Advertising
background image

800.406.7387 • www.metalsales.us.com

© Metal Sales Manufacturing Corporation Subject to change without notice Effective Date 5/13

VERTICAL SEAM

30

11" r

Idge

/h

Ip

o

ver

d

eckIng

1. Once panels have been installed, field cut the Vertical Seam Z-Closure (see page 47) to fit between the panel ribs.

2. Place a row of Double Bead Tape Sealant across panel and over each panel rib approximately 2" from panel end. Before

proceeding make sure Z-Closure placement will accommodate 11" Ridge/Hip cover.

3. Install field cut Z-Closure (as shown on page 47).

4. Fasten Z-Closure through panel with #10-12 x 1" Pancake Head Woodscrews (4 per panel).

5. Apply a row of Double Bead Tape Sealant across top leg of Z-Closure filling any gaps or openings around panel ribs.

6. Position and install 11" Ridge/Hip Cover flashing to Z-Closure with

1

/

8

" x

3

/

16

" Pop Rivets (as shown).

7. If two or more flashings are required, lap the flashing over the previously installed flashing by a minimum of 2" placing a bead

of Tube Sealant between the flashings and securing with pop rivets 2

1

/

2

" o.c.

Double Bead Tape Sealant

1

/

8

"

x

3

/

16

" Pop Rivet (see below)

Vertical Seam Clip

Moisture Barrier (by others)

Vertical Seam Panel

Vertical Seam Z-Closure
#10-12 x 1" PHW (4 per panel)

Tube Sealant

11" Ridge/Hip Cover

Double Bead Tape Sealant

1

1

/

2

"

CAUTION

Additional screws

may be required for

high snow loading

and steep slopes.

INSTALLATION NOTES

Pop Rivet

Flashing

Z-Closure

Tape Sealant

1:12 Slope

Minimum

over Solid

Substrate

Advertising