Vertical seam – Metal Sales Vertical Seam Installation User Manual

Page 25

Advertising
background image

800.406.7387 • www.metalsales.us.com

© Metal Sales Manufacturing Corporation Subject to change without notice Effective Date 5/13

25

VERTICAL SEAM

v

alley

o

ver

d

eckIng

All Valley flashings must be installed prior to panel installation. If two or more valley flashings are required, valley must

be installed working from eave to peak. It is recommended that ice and water shield be installed under valley flashing for

added moisture protection.

1. Install Valley flashing against substrate. To hold Valley flashing in place, fasten to substrate with #10-12 x 1" Pancake Head

fastener 4'-0" o.c.

2. Apply a row of Double Bead Tape Sealant across both sides of Valley flashing approximately 5" from center of valley.

3. Properly align and install Offset Cleat on both sides of Valley flashing to accommodate panel hem and fasten to substrate with

#10-12 x 1" Pancake Head fastener 1'-0" o.c.

4. Install panel by engaging field hemmed end of panel (see page 18) to Offset Cleat (see pages 20-21 for panel installation).

5. If two or more flashings are required, lap the flashing over the previously installed flashing by a minimum of 2", placing a bead

of Tube Sealant between the flashings and securing with (2) Pop Rivets in the 1" water diverter.

Double Bead Tape Sealant

Offset Cleat

Vertical Seam Panel

Vertical Seam Clip

Moisture Barrier (by others)

#10-12 x 1" PHW (1'-0" o.c.)

Valley

Tube Sealant

3" (MIN)

INSTALLATION NOTES

Note:

Panel rib must be field

notched and flat part

of panel must be field

bent to accept Offset

Cleat (see page 18).

Tube Sealant

1:12 Slope

Minimum

over Solid

Substrate

Advertising