Mm inch – Body Solid G2B User Manual

Page 9

Advertising
background image

A s s e m b l y I n s t r u c t i o n s

Assembly of the G2B takes professional installers about 3 hours to complete. If this is the first time you have

assembled this type of equipment, plan on significantly more time.

Professional installers are highly recommended!

However, if you acquire the appropriate tools, obtain assistance, and follow the assembly steps sequentially,

the process will take time, but is fairly easy.

Assembly Tips

Read all “Notes” on each page before beginning each step.

While you may be able to assemble the G2B using the

illustrations only, important safety notes and other tips are

included in the text.

Some pieces may have extra holes that you will not use. Use

only those holes indicated in the instructions and illustrations.

NOTE: To find out the length of a particular bolt, measure its

shank (the long, narrow part beneath the head). Refer to the

following diagram:

Do not fully tighten bolts until instructed to do so.

Note: After assembly, you should check all functions

to ensure correct operation. If you experience

problems, first recheck the assembly instructions

to locate any possible errors made during assembly.

If you are unable to correct the problem, call the

dealer from whom you purchased the machine or

call 1-800-556-3113 for the dealer nearest you.

IMPORTANT!

Before you begin you should fold-out pages 82, 83 and 84.

This is a quick reference guide that shows all hardware

parts (in actual size) along with the corresponding key

numbers on the assembly instructions.

mm

Inch

9

Advertising