Informations, Information, Informationen – Sulky VISION 2 DPB User Manual

Page 83

Advertising
background image

83

GB

Informations

/

Information

/

Informationen

Problems/Solutions

E

1

4

83

P

ROBLEMS

S

OLUTIONS

The control unit does not switch on

Check

- unit/power supply connections
- power supply cable fuses

Flow rate test

Check

- calibration factor
- that the shutters are open

Repeat the test.

Shutters open to maximum then to minimum

Check

- tractor forward speed coefficient
- spreading width
(24.00 note the position)

The unit switches on but the rams do not move

Check

- fuses
- the battery power supply

The area counter reading is incorrect

Check

- connection / machine
- working width
- drive rate

Flow rate

Check

- programmed flow rate
- fertiliser coefficient
- spreading width
- tractor forward speed
- ram travel
- tramlining

The forward speed is incorrect

Check

- connection on unit
- distance between the detection ring / sensor
- that the detection ring is rotating correctly
- sensor wire continuity
- 100-m coefficient

The tonnage counter reading is incorrect

Check

- connection / machine
- working width
- drive rate
- fertiliser coefficient
- shutter opening/closing

Advertising