Chapter 2

Installation

Figure 3 - ER BTB system layout

System Clearance

The two Automatic Bypass Switchboard doors are hinged on the left, the 800A
MegaDySC module door is hinged on the left, and the ER Module door is
hinged on the right. Clearance must be given to allow the doors to swing fully
open as shown in the

SR System Layout on page 8

, the

ER SBS system layout on

page 9

, and the

ER BTB system layout on page 10

.

Only front access and top access are required for installation and commissioning.
Rear access and left side access should be maintained when possible, to simplify
future maintenance tasks.









$