Figure 3 - er btb system layout, System clearance, Er btb system layout – Rockwell Automation 1608M MegaDySC User Manual, 800 Amp - 208V User Manual
Page 10
Advertising
10
Rockwell Automation Publication 1608M-UM003A-EN-P - December 2013
Chapter 2
Installation
Figure 3 - ER BTB system layout
System Clearance
The two Automatic Bypass Switchboard doors are hinged on the left, the 800A
MegaDySC module door is hinged on the left, and the ER Module door is
hinged on the right. Clearance must be given to allow the doors to swing fully
open as shown in the
, the
, and the
ER BTB system layout on page 10
Only front access and top access are required for installation and commissioning.
Rear access and left side access should be maintained when possible, to simplify
future maintenance tasks.
$