Communications port test, Communications port test -12 – Rockwell Automation 2707-MVH232_MVP232 MicroView Operator Interface Module User Manual

Page 66

Advertising
background image

Publication 2707-UM005B-EN-P

8-12 Troubleshooting and Maintenance

Communications Port Test

Use the communications test to verify the operation of the MicroView
communications port.

During the communications test, the MicroView must be supplied with
11 to 25 VDC through the power port. The following power adapters
are recommended:

Catalog No. 2707-PS120, MicroView 120VAC Power Adapter

Catalog No. 2707-PS220, MicroView 220VAC Power Adapter

The communications test requires a loopback connector. You can construct a simple
loopback connector as follows:

To test the communications port:

1. Connect the Loopback connector to the communications port of

the MicroView (Pins 4 and 7).

2. Connect an AC to DC power adapter to the power port.

3. Use the [NEXT] and [PREV] keys to display “Comm Port” on the

test screen.

4. Press [

] to initiate the test.

The MicroView will continuously send out and receive a
message at the communications port and display:

5. Press any key to terminate the communications test.

Loopback
Connector
Pins 4 and 7

MicroView RS-232
Communications Port

MicroView RS-232
Communications Port

+24V dc

DC Com

Data In (RXD)

Data Out (TXD)

Signal Ground

8-Pin Female C DIN Connector

1

2

3

6

7

8

5

4

1

2

3
4

5

6

7

8

Diagnostic Tests

Comm Port

COMM Self Loop

Any Key to Cont.

Advertising