Bendix Commercial Vehicle Systems C-300N HYDRAULIC POWER STEERING1/99 User Manual

Page 11

Advertising
background image

11

FIGURE 13 - REMOVING/INSTALLING INPUT SHAFT DUST

BOOT

FIGURE 14 - VALVE BODY BOLT REMOVAL

FIGURE 12 - PREPARATION FOR DISASSEMBLY

5. Remove the steering gear from the vehicle.

SPECIAL TOOLS

Two special tools are required to disassemble/assemble the

C- 300N and C-500N. The tools listed and illustrated here

are useful but not all required. All special tools may be
obtained from authorized Bendix part outlets.

DISASSEMBLY

GENERAL
A high level of cleanliness should be observed at all times
when working on the power steering gear. Clean the exterior

of all parts prior to disassembly.

The following disassembly and assembly procedure is

presented for reference purposes and presupposes that a
major rebuild of the power steering gear is being

undertaken. Several replacement parts and maintenance

kits are available which do not require full disassembly. The
instructions provided with these parts and kits should be

followed in lieu of the instructions presented here.

After removing the power steering gear from the vehicle and
cleaning the outside, secure the power steering gear to the

work bench for disassembly. A large vise with jaw protectors

may be used. Clamp across the mounting bolt bosses. (Do
not overtighten.) Figure 12

OUTPUT SHAFT REMOVAL

1. Remove the external dust boot (2) from the spindle

assembly’s input shaft spline. Figure 13

Advertising