Bendix Commercial Vehicle Systems C-300N HYDRAULIC POWER STEERING1/99 User Manual

Page 24

Advertising
background image

24

FIGURE 51 - INSTALLING HOUSING OUTPUT SHAFT SEAL

FIGURE 53 - INSTALLING OUTPUT SHAFT ROLLERS IN

HOUSING

FIGURE 50 - DETAIL OF SEAL & BACKUP RING ASSY.

PRESSURE

SEALING LIP

FOR O.D.

FIGURE 52 - INSTALLING STEERING LIMITING STEM

spindle should rotate freely and will begin to thread into

or out of the piston depending upon the direction of

spindle rotation.

Note: Hold the ball return tube firmly in place when rotating

the spindle.

22. While FIRMLY HOLDING THE BALL TUBE (35) IN

PLACE insert as many of the balls(9) through the

opening in the ball tube as possible. Rotate the input

shaft (3) slightly to make room for each ball that is
inserted. (Note: As the spindle is rotated the ball tube

may tend to rise out of the holes in the piston.)

Continue to insert balls until ALL TWENTY-SIX HAVE
BEEN INSTALLED. Figure 49 Lightly grease the sealing

surfaces of the tube cover(24) and install it in the piston

PRESSURE

SEALING LIP

FOR I.D.

BACKUP RING

ITEM 28

SEAL

ITEM 29

BACKUP RING INSTALLED

IN NON-PRESSURE SIDE

OF SEAL

NON-PRESSURE

SIDE OF SEAL

PRESSURE

SIDE OF SEAL

Advertising