Installing the TPM

The TPM has two RF connectors (Source and Load) that connect to the

transmission line, three test port connectors that are type N female

connectors (Forward, Reflected, and Test), and one nine-pin subminia-

ture communication connector (DB-9 Male).
1. Do the following:

Connect the RF connector labeled Source to the transmitter
side of the transmission line.

Connect the RF connector labeled Load to the antenna or load
side of the transmission line.

Use an appropriate coupling kit to secure the TPM in place.

2. Connect the DB-9 connector to a single channel on Model 3140A

power meter panel, or to an alternate appropriate power supply

and voltmeters that will indicate the forward and reflected power.

Note:

The chart below Figure 2 identifies the signals on

each pin of the DB-9 connector.

Note:

Above 4VDC, the accuracy spec does not apply.

CAUTION

Pin 4 must be connected to power supply ground,

other grounds can be left open if desired.

Pin

Description

1

Forward Voltage Output, 0 to 5 VDC, 1.0 kohm impedance

2

Ground

3

Reflected Voltage Output, 0 to 5 VDC, 1.0 kohm impedance

4

Power Supply Ground

5

DC Power Input, +11 to +18 VDC, <0.1 A current draw

6

Ground

7

Ground

8

Ground

9

Zero Calibration. DO NOT ground this pin. Leave this pin floating.

1

6

9

5

Pin 4 -

Power Supply
Ground

Figure 2

DB-9

Connector