3 installation, 1 setting up the instrument, 1 packaging – Metrohm 772 Pump Unit User Manual

Page 15: 2 checks, 3 location, 2 mounting the tubings, 1 mounting the pump tubing, Setting up the instrument, Packaging, Checks

Advertising
background image

■■■■■■■■■■■■■■■■■■■■■■

3 Installation

772 Pump Unit

■■■■■■■■

7

3 Installation

3.1

Setting up the instrument

3.1.1

Packaging

The instrument is supplied in highly protective special packaging together
with the separately packed accessories. Keep this packaging, as only this
ensures safe transportation of the instrument.

3.1.2

Checks

Immediately after receipt, check whether the shipment has arrived com-
plete and without damage by comparing it with the delivery note.

3.1.3

Location

The instrument has been developed for operation indoors and may not be
used in explosive environments.

Place the instrument in a location of the laboratory which is suitable for
operation, free of vibrations, protected from corrosive atmosphere, and
contamination by chemicals.

The instrument should be protected against excessive temperature fluctu-
ations and direct sunlight.

3.2

Mounting the tubings

3.2.1

Mounting the pump tubing

Note

Selecting the correct pump tubing is very important for its function and
lifetime (see Chapter 5, page 15).

1 Cut the pump tubing to a length of approx. 17 cm.

2 Insert the tubing olives (6.1820.050) into the two tubing ends.

Figure 2

Inserting the tubing olives

Advertising