4 installing the flow-through cell, Installing the flow-through cell, Figure 4 – Metrohm 944 Professional UV/VIS Detector Vario User Manual

Page 23: Cell block

Advertising
background image

■■■■■■■■■■■■■■■■■■■■■■

3 Installation

944 Professional UV/VIS Detector Vario (2.944.0010)

■■■■■■■■

15

A longer section of silicone tubing (6.1816.020) may have to be cut
to size and mounted (see also the manual for the IC instrument).

5 If one of the instruments in the stack is equipped with a leak sensor

connection socket, connect the leak sensor (see manual of the IC
instrument)
.

6 Restore any capillary connections that may have been removed.

3.4

Installing the flow-through cell

1

2

3

3

4

Figure 4

Cell block

1

Cell holder
Holder for the flow-through cell.

2

Cover plate
Protects the cell holder form contamination
if no cell is installed.

3

Knurled screws

4

Cylinder screw
For the correct alignment of the flow-
through cell.