3 installation, 1 setting up the instrument, 1 packaging – Metrohm 806 Exchange Unit User Manual

Page 17: 2 checks, 3 location, 2 start-up, 1 preparing the exchange unit, Setting up the instrument, Packaging, Checks

Advertising
background image

■■■■■■■■■■■■■■■■■■■■■■

3 Installation

806 Exchange Unit

■■■■■■■■

9

3 Installation

3.1

Setting up the instrument

3.1.1

Packaging

The instrument is supplied in highly protective special packaging together
with the separately packed accessories. Keep this packaging, as only this
ensures safe transportation of the instrument.

3.1.2

Checks

Immediately after receipt, check whether the shipment has arrived com-
plete and without damage by comparing it with the delivery note.

3.1.3

Location

The instrument has been developed for operation indoors and may not be
used in explosive environments.

Place the instrument in a location of the laboratory which is suitable for
operation, free of vibrations, protected from corrosive atmosphere, and
contamination by chemicals.

The instrument should be protected against excessive temperature fluctu-
ations and direct sunlight.

3.2

Start-up

3.2.1

Preparing the exchange unit

Proceed as follows:

1 Mount the holding clamps in such a way that the reagent bottle rests

safely on the exchange unit.

2 Check whether the reagent bottle contains solvent.

3 Fill the adsorber tube with a suitable adsorber material.

CO

2

adsorption: Soda lime

KF reagent: Molecular sieve

If no special adsorber material is necessary, the adsorber tube may
also be used as dust filter when filled with cotton.

4 Attach the filled adsorber tube onto the reagent bottle.

Advertising