6 setting up the titration cell, Setting up the titration cell – Metrohm 859 Titrotherm User Manual

Page 25

Advertising
background image

■■■■■■■■■■■■■■■■■■■■■■

3 Installation

859 Titrotherm

■■■■■■■■

17

3.6

Setting up the titration cell

Install the titration cell in accordance with the following figure:

1

6

7

8

2

3

4

5

1

Propeller stirrer (802 Stirrer)
Connect the stirrer to the stirrer connector
on the rear of the titration stand.

2

Sensor Thermoprobe (6.9011.020 or
6.9011.040)
Connect the sensor at T-Port 1 (or T-Port 2)
to the rear side of the 859 Titrotherm.

3

SGJ sleeve (6.1236.050)
SGJ 14/12 mm Material: PE.

4

SGJ intermediate cone (6.2727.010)
For the 802 Stirrer.

5

Stirring propeller (6.1909.010)
L= 96 mm, Material: PP.

6

FEP tubing (6.1805.100)
Connect the tubing (40 cm) to Port 1 on the
dosing unit.

7

Antidiffusion tip M6 (6.1543.200)
L=151 mm, Material: ETFE/FEP.

8

Link stopper (6.1446.030)
Material: ETFE.

Advertising