Trebor 50R-X12 Maxim User Manual

Page 20

Advertising
background image

PAGE 20

MAXIM 50R-X12 PUMP OPERATION / MAINTENANCE MANUAL

Figure 4-5

Remove shaft insert tool and thread second push plate onto main shaft.

Tighten snug; do not over tighten as damage may occur.

4.8.c Final Assembly

Reattach pump to assembly fixture.

Attach union nut to one side of pump body (hand tight). Do not install

diaphragm on this step. This will protect body during initial pump assembly.

Remove pump from the assembly fixture.

Place pump body with union nut down and place two diaphragms, removing

all air from between diaphragms, with “V” groove point toward the body.

Install head on body. Note tab alignment and orientation of transfer tube

ports in head.

Install union nut on pump while gently pressing down on the head to engage

tabs in head and body, spin union nut down hand tight.

Turn pump over and remove union nut to install diaphragms.

Repeat diaphragm, head and union installation.

Lock body into mounting fixture.

Using strap wrench, torque union nuts slowly to 75 ft-lbs. with the wrench at

90° +/-

15° to the nut’s surface as shown.

Figure 4-6

Advertising