Great Plains ADC1150 Operator Manual User Manual

Page 27

Advertising
background image

25

Section 2 Implement Assembly and Setup

7/28/10

Model 1150 1995 - 1997 167-058M

Great Plains Mfg., Inc.

45’ Drills
Position the outer fold cylinders with the base end toward
the center of dill and rod ends out. Pin the base end to the
cylinder lug and secure with clip. Leave rod end unhooked
and block up so that the rod will not come in contact with
anything when extended. Do not connect the rod end until
after air is bled from the fold circuit.

Bleeding Fold Cylinders

Figure 2-7

14446

Refer to Figure 2-8 and Figure 2-9. Install hydraulic hoses.
Note the hose lengths and be sure to use the correct length
hose in each location. Start with the longest hose and work
to the shortest.

Be sure to use the hydraulic hose clips on the openers and
route the hoses through them. When the hoses are
hooked up be sure that they are not twisted and will not get
pinched when the implement is raised, lowered, folded or
unfolded. Do not let the hoses rub on sharp edges and be
sure there is enough slack for down-flex.

NOTE: The SAE o-ring and JIC 37˚ flare type hose
connections do not require sealant for reconnecting.
They do not require high torque for a good seal.

NOTE: Do not try to fold the implement unless the flex
limiter bars are installed.

Advertising