35

Section 2 Implement Assembly and Setup

7/28/10

Model 1150 1995 - 1997 167-058M

Great Plains Mfg., Inc.

Refer to Figure 2-18:
2.

Attach the end of the hose to opener.

For floating hoe openers slide clamp over the end of
the hose 6”. Put the end of the hose in the seed tube
6”. Hook the clamp ends in the holes at the top of the
seed tube.

Hose Installation On Openers

Figure 2-18

14563

3.

Route the hose to the tower outlet. Allow just enough
slack for down flex of wings. Be sure to use outlet as
shown on routing diagram.

4.

Allow 2 1/4” of the hose to extend past the edge of the
tower then squarely and smoothly cut off the hose.

5.

Push the end of the hose into the port until it contacts
the ridge and stops, this is approximately 2 1/4”.

6.

Repeat steps 1 through 6 for all 1” hoses on each tower.

7.

When all hoses are installed on a tower, tighten the
bolts holding the halves together.

8.

Check all hoses to be sure that they are not rubbing on
sharp edges and will not be damaged when the drill is
raised, lowered, folded, or unfolded. Re-route if need-
ed to prevent damage.

NOTE: The tower bolts are equipped with nylock nuts
and should not be over-tightened. Tighten the bolts
only until the hose is held securely against being
blown out. Do not bend tower plates.