Mount sequence valve, Install hoses, Prepare existing fold hitch hoses – Great Plains 3S-5000HDF Assembly Instructions User Manual

Page 10: Remove hose handles, Pull a fish line, Rb r b

Advertising
background image

10

Great Plains Manufacturing, Inc.

Front Page

Appendix

3S-5000/F/HD/HDF Markers

113-890M

Front Page

Appendix

2013-04-09

Mount Sequence Valve

Refer to Figure 16
43. Select the configured:

810-422C VALVE,SEQ SHOEMAKER HI FLO

and two sets new:

802-014C HHCS 3/8-16X3/4 GR5

804-013C WASHER LOCK SPRING 3/8 PLT

Locate the mount bracket

at the rear of the

tongue. Orient the sequence valve with ports 1 and 2
facing forward and the tapped

3

8

-16 holes facing

down. Secure the valve to the mount with the
bolts

and lock washers

. Tighten only to

Grade 2 torque.

Install Hoses

Prepare Existing Fold Hitch Hoses

Remove Hose Handles

Refer to Figure 17
44. Locate the existing fold circuit hoses

.

These have gray hose handles (

and

).

Mark each hose as Base/Extend

or

Rod/Retract

, based on the symbols on the hose

handles.

45. Remove and save one set each:

841-540C HG HANDLE - GRAY EXT

841-541C HG HANDLE - GRAY RET

Pull a Fish Line

46. Connect a strong fish line to one of the existing fold

hoses. Pull the hose and line from the rear end of the
tongue.

184

U

D

F

B

L

R

7

165

141

Figure 16

Mount Sequence Valve

34781

184

141

165

7

141

165

14

14

13

12

11

Extend

Retr

act

R

B

R

B

Figure 17

Remove Hose Handles

34784

14

12

13

B

R

12

13

Advertising