Sequence valve hoses, Marker tongue hoses to sequence valve, Marker cylinder base hoses – Great Plains 3S-5000HDF Assembly Instructions User Manual

Page 13: Marker cylinder rod hoses, Sequence to marker cylinder hoses

Advertising
background image

Install Hoses

Front Page

Appendix

Great Plains Manufacturing, Inc.

13

2013-04-09

Front Page

Appendix

113-890M

Sequence Valve Hoses

Marker Tongue Hoses to Sequence Valve

Refer to Figure 23
58. At the sequence valve

, connect marker tongue

rod/retract hose

to valve Port 1.

59. Connect marker tongue base/extend hose

to

valve Port 2.

60. Secure both hoses under existing clamps forward on

(both sides) of the tongue.

Marker Cylinder Base Hoses

61. Select two new:

841-954C HH3/8R1 330 9/16FJIC

Route the hoses from outboard of the fold cylinder
rod ends, following the existing lift cylinder hoses,
through an opening in the fold cylinder support
weldment, under the cylinder rods, and through the
wire loop at the wing fold pivot center-line

.

Connect each of these hoses to the “R” Ports
(LH hose to R1, RH hose to R2).

Marker Cylinder Rod Hoses

62. Select two new:

841-955C HH3/8R1 350 9/16FJIC

Route the hoses as in step 61. Connect each of
these hoses to the “C” Ports (LH hose to C1,
RH hose to C2).

Sequence to Marker Cylinder Hoses

Refer to Figure 24
63. Route all cylinder hoses along center and wing tool

bars, following the routing of the lift cylinder hoses.
Use existing clamps and weldment openings.

Be sure to allow slack at the wing flex pivots

. Use

the same slack as the lift hoses.

U

D

F

B

L

R

R

B

197

197

184

199

198

198

199

7

7

Figure 23

Sequence Valve Hoses

34830

184

197 R

197 B

198

7

199

U

D

F

B

L

R

8

Figure 24

Cylinder Hose Routing

34310

8

Advertising