Z5 z6 z7 z8 – Edge Lighting TruLine 1.6A, 24VDC - Plaster-In LED system User Manual
Page 10
10
14: Install mounting straps behind the drywall (suggested
spacing is every 32") by threading a drywall screw into
the perforated material.
15: Place the mounting strap behind the cut drywall and
rotate into place using the drywall screw as a handle.
16: Secure the mounting strap to the drywall using two
drywall screws. Mark the location on the drywall.
17: Remove end cap from the cut channel section that will be
mounted to the power junction box.
18: Place both power connectors into the end cap insert.
19: Slide the assembled end cap insert and power connectors
into the end cap.
20: Insert the #4-40 Torx screws through the end cap holes
and thread into the TruLine 1.6A channel.
21: Tighten the end cap to the channel using the provided
T10 Torx screwdriver.
Z5
Z6
Z7
Z8
MOUNTING
STRAP
JUNCTION
BOX
DRYWALL
SCREW
15
16
16
END CAP
END CAP
INSERT
POWER
CONNECTOR
18
19
END CAP
TRAP DOOR
FRAME
21
T10 TORX
20
22: Using the marked locations on the drywall, carefully make
holes in the channel flange using the provided square drill
with counter sink bit.
23: Secure the channel to the studs/mounting straps through
the drywall with the #6 screws using the provided square
recess bit.
#6 SCREWS
CHANNEL
23