24: Apply ultra-thin drywall tape along edges of channel to
prevent cracking of plaster after installation.

NOTE:

Test the LED strip before any plaster work is done.

NOTE:

Cover the channel opening with blue contractor’s tape

before plastering.

25: Use a 12" compound knife for a smooth compound spread.
Sand, paint, and finish the plaster and drywall before
removing the blue contractor’s tape.

26: Line up the red wire side of the power connector with the
“+24VDC” marking on the Soft Strip. Push the male connector
of the Soft Strip into the female connector of the power cables.

27: Carefully remove the backing from the LED soft strip, making
sure not to remove the tape from the soft strip.

28: Firmly press down the adhesive portion of the soft strip onto
the channel surface while removing the rest of the backing,
making sure there are no air bubbles that can cause surface
irregularities.

Z10

Z11

Z12

24

ULTRA THIN
DRYWALL TAPE

CONTRACTOR'S
TAPE

25

PLASTER

12" COMPOUND
KNIFE

LED SOFT
STRIP

POWER
CONNECTOR

26

27

28