Edge Lighting TruLine 1.6A, 24VDC - Plaster-In LED system User Manual
Page 13
Section Five: Zig Zag Installation
Z17
JUNCTION
BOX
1
MOUNTING
BRACKET
PHILLIPS
SCREW
ADJUSTABLE
MOUNTING BAR
1: Mount each adjustable mounting bar to one side of the
junction box and secure them with the mounting brackets
and two Phillips screws provided.
2: Place the lips on the adjustable mounting bars against
the studs. Secure the adjustable bars to the studs with
the eight #8 screws.
3: Install conduit (if required by local electrial code) and run
low-voltage power wires to the junction box.
NOTE:
The adjustable mounting bars mount to studs that
are spaced 13" to 24" apart.
INSTALLATION
DIRECTION
ADJUSTABLE
MOUNTING BAR
STUD
#8 SCREW
2
3
JUNCTION
BOX
CONDUIT W/
LOW-VOLTAGE WIRES
7: Insert the joiner bars halfway into the channel trap door
frame. Tighten the two M4 set screws on each joiner bar
with a 1.5MM Allen wrench.
8: Slide the other section of channel onto the joining bars and
tighten the remaining M4 set screws with a 1.5MM Allen
wrench.
1: Mount each adjustable mounting bar to one side of the
junction box and secure them with the mounting brackets
and two Phillips screws provided.
6" FIXED
JAB SAW
4: Mark the area where the junction box will be located on the
drywall.
5: Install the drywall.
6: Cut out the marked areas to expose the junction box.
4
6
WALL
7
8
STARTER
SECTION
CHANNEL
SECTION
9: Assemble the lens to the channel before cutting.
LENS
CHANNEL
TRAP DOOR FRAME
10: Determine the channel length and cut channel and lens at a 45° angle from the outer corner.
11: Cut additional lens/channel assembly for the opposing 45° angle and any other corners as required for the installation.
CHANNEL
LENGTH
45°
LENS
9
10
Z18
Z19
Z20
11
Z21
Z22
13