28: Apply ultra-thin drywall tape along edges of channel to
prevent cracking of plaster after installation. DO NOT
overlap strips of drywall tape.

29: Use a 12" compound knife for a smooth compound spread.
Sand, paint, and finish the plaster and drywall before
removing the blue contractors tape.

NOTE:

Test the LED strip before any plaster work is done.

NOTE:

Cover the channel opening with blue contractor’s

tape before plastering.

30: Remove the blue contractors tape from the inside of the
channel. Clean the channel surface with alcohol to remove
any dust or debris before continuing.

31: Attach the trap door to the junction box using the #6-32
screw.

32: Line up the red wire side of the power connector with the
“+24VDC” marking on the Soft Strip. Push the male
connector of the Soft Strip into the female connector of
the power cables.

33: Carefully remove the backing from the LED soft strip, making
sure not to remove the tape from the soft strip. Firmly press
down the adhesive portion of the soft strip onto the channel
surface while removing the rest of the backing, making sure
there are no air bubbles that can cause surface irregularities.

ULTRATHIN
DRYWALL
TAPE

PLASTER

CONTRACTORS
TAPE

12" COMPOUND
KNIFE

28

29

31

32

33

TRAP DOOR

#6-32
SCREW

POWER
CONNECTION

LED STRIP

PAPER
BACKING

Z32

Z33

Z34

16