Setting up the stacklink, Setting up the tracklink(s) – Hudson Robotics LabLinx User Manual

Page 10

Advertising
background image

StackLink User Manual

Hudson Robotics, Inc.

6

Setting up the StackLink

 Remove the StackLink from the carton and carefully remove the protective plastic

covering.

 Un-wrap any TrackLinks and/or StopLinks included.
 Remove the Stacks from the carton, then remove the stack from the packaging
 Install the supplied Stacks on the StackLink securely.

Setting up the TrackLink(s)

 Position the TrackLink into either side of the StackLink and insert the track so the

groves match and fit into place (Figure 7).

NOTE: Be sure the TrackLink and StackLink gearing is properly positioned and
aligned for correct operation

 Secure the track with the included Clamp Bars (Figure 11). Repeat if connecting

an additional TrackLink if required.

 Secure the TrackLink to any instrument nests.

NOTE: Calibration and/or origin adjustments may need to be set for these
instruments. (I.E. PlateCrane positions, Micro10 dispensing origin, etc.)

Figure 7

Advertising