Operators instructions cleverlevel switch, lffs, Mounting – Baumer CleverLevel - LFFS User Manual

Page 3

Advertising
background image

Installation of 3A approved and EHEDG certified products:

1) Use only a 3A approved counter part.

2) The inspection hole should be visible and drained.

3) Mount the instrument in a self drained position.

4) Level the inner surface of the pipe with the counter part.

5) Welding's should be grinded to Ra= 0.8

Operators instructions
CleverLevel switch, LFFS

Example
with 8126-928

Example
with PM023

Example
with 8126-916

Leakage indication hole

must be places downwards

Fitted
incorrect

Cannot be
drained

WARNING

After installation and configuration

Check the leak tightness of the sleeve.

Check the tightness of glands or M12 plugs.

Check the tightness of the cover

Mounting

Tighten the union with a torque of:

Std. version 20...25 Nm.

Sliding connection 25...30 Nm.

www.baumer.com

Operators instructions: 11109132 02 EN Page 3 / 12

Advertising