[FIG. 4]

4479 HEAD

PREP FOR FRAME HEAD.

SECTION III-FABRICATION C - DRILLING TEMPLATE

(STEP 1)

SHEAR BLOCK HORIZONTALS

[FIG. 3]

4479 HEAD

PAGE 9

USE THE INTERIOR & EXTERIOR EDGE AND EACH END OF THE

HEAD TO ALIGN DRILL JIG DJ19. USE .228 DIA. (#I) DRILL AT

DARKENED AREAS ONLY FOR STEP 1.

AFTER STEP 1 IS COMPLETE, PROCEED TO STEP 2.

COUNTERSINK HOLES 82˚ TO .438 DIAMETER.

EXTERIOR

INTERIOR

INTERIOR

EXTERIOR

.625"

1.000"

.625"

1.000"

82˚ CTSK

@ .438 DIA.

(2) EACH END

.625"

1.000"

525 IMPACT

1.000"

.625"

DPS 1/2004

1.000"

1.000"

.625"

.625"

1.000"

1.000"

.625"

.625"