Subsill installation, Step 4) bench marks for subsill location – EFCO 525 Series User Manual

Page 23

Advertising
background image

& INSTALLATION

SECTION VII - SUBSILL FABRICATION

DPS 1/2004

Before installing the subsill, the exterior face location of the frame

should be found using bench mark information from the shop
drawings or architectural drawings. The subsill protrudes 1/4" to the
exterior of the exterior face of the frame. Locate this line based on

the bench mark information, and snap a chalk line to follow when

installing the subsill. The subsill exterior angled leg should follow the

chalk line for correct installation.

STEP 4) BENCH MARKS FOR SUBSILL LOCATION

Regardless of whether an end dam is used or not, the subsill must be

sealed to the condition to create a watertight condition when it is

installed. Begin the process by cleaning the bottom of the subsill with

a degreasing solution and wipe it dry after all foreign material has

been removed. When the subsill is clean and dry, apply a generous

amount of 795 silicone or equivalent silicone type sealant to the areas
shown in figures 24 and 25 on page 22. This should be done just

prior to the installation of the subsill to prevent the sealant from

setting up before the subsill is installed.

STEP 5) PREPARING AND SEALING THE SUBSILL

FOR INSTALLATION

An end dam may not be required in all cases. Before installing a

subsill without an end dam, you must determine if the surrounding
condition can be used to create a water dam, and if the material will

not degrade over time if it comes into contact with water. Once it has
been determined that the condition is appropriate to create a water

dam, continue the installation of the subsill as described in Steps 4-8
of this section.

STEP 3) SUBSILL INSTALLATION WHEN END DAMS

ARE NOT REQUIRED

(CONT.)

PAGE 21