EFCO 5XP Series User Manual

Page 27

Advertising
background image

EFCO CORPORATION 6/8/2012 PART NO. YW43

Page 27 of 34

5XP SLIDING GLASS DOOR INSTALLATION INSTRUCTIONS







































See Fig. 10 for Step E below:
Step E. Marry a vertical seal to the already applied sealant across the sill; seal the joint between the

fixed panel meeting rail and the threshold. This seal joint will follow the underneath profile of
the threshold and fill the gap between both the horizontal and vertical weather-strip. All
sealant joints must be continuous with one another and tooled with no voids.




Note:
The sealant at the head is an exact mirror of the sealant applied to the sill as
shown in Figs 8, 9, and 10.





All sealant must be continuous with
one another and tooled with no
voids.

FIXED
PANEL

SILL

THRESHOLD

Fig. 10

Full length sealant across sill

FIXED
PANEL
MEETING RAIL

Advertising