Preparation of frame – Oldcastle BuildingEnvelope Standard Door and Frame User Manual

Page 10

Advertising
background image

D O O R A N D F R A M E

PREPARATION OF FRAME

All hardware back-up plates are installed in the frame at the factory. All sash materials will have been cut to

length and prepped in the factory.

If the doors and frames are from our stock, the transom frames are fabricated for a vertical frame size of 125

1/2". If your opening is smaller, cut the verticals and sash down to the appropriate length; leaving a minimum 1/4"

joint at head. The prep for the transom head horizontal should be made using; either: our jig, EZ-Punch,

or a small cut-off of the head material.

Attach frame portion of pivots to the frame.

Attach closer clips (if concealed overhead closer) and/or shear blocks to jambs.

Cut and notch threshold as required for hardware.

Assemble frame, including threshold. For frames with transoms, sash members must slide into jambs and

transom bar during assembly on FG3000. Parts will not snap due to tolerance restrictions.

The frame is now ready for installation.

"A"

VIEW "A"

10

MAY 2012

D O O R & F R A M E

I N S T A L L A T I O N M A N U A L

Web Address: www.oldcastlebe.com

Phone: 1-866-OLDCASTLE (653-2278)