Push bar installation, Standard push bar installation – Oldcastle BuildingEnvelope Standard Door and Frame User Manual

Page 28

Advertising
background image

STANDARD PUSH BAR INSTALLATION

D O O R A N D F R A M E

PB-21 Push Bar will be shipped with screws for attachment. Holes are pre-drilled in the factory.

Where PB-21 is not used with PH-20:

Step 1: Lay out the parts to be sure they are all there.

Step 2: Place washer on 1/4" diameter through-bolts.

Step 3: Align PB-21 with holes in door stiles.

Step 4: Insert through-bolts into holes in stile from exterior of door.

Step 5: Tighten through-bolts into push bar.

Where PB-21 is used with PH-20:

Step 1: Lay out the parts to be sure they are all there.

Step 2: Align Pull with top hole on exterior of door.

Step 3: Insert through-bolt stud in top hole from interior into pull.

Step 4: Loosen setscrews in PB-21.

Step 5: Place PB-21 over stud on lock stile and align with hole in hinge stile.

Step 6: Place washer on 1/4" diameter through-bolts.

Step 7: Insert through-bolt from exterior into PB-21 at hinge stile.

Step 8: Tighten setscrews into stud on lock stile.

Wire Push Bar Replacement for PB-11 shipped with studs for use in pre-existing riv-nuts.

Step 1: Lay out the parts to be sure they are all there.

Step 2: Remove PB-11 and bracket.

Step 3: Install studs into existing riv-nuts.

Step 4: Back out setscrews in replacement push.

Step 5: Align replacement push over studs.

Step 6: Tighten setscrews.

28

MAY 2012

D O O R & F R A M E

I N S T A L L A T I O N M A N U A L

Web Address: www.oldcastlebe.com

Phone: 1-866-OLDCASTLE (653-2278)

Advertising
This manual is related to the following products: