Pull handle installation, Standard pull handle installation – Oldcastle BuildingEnvelope Standard Door and Frame User Manual

Page 29

Advertising
background image

STANDARD PULL HANDLE INSTALLATION

D O O R A N D F R A M E

PH-20 Pull Handle will be shipped with screws for attachment. Holes are pre-drilled in the stiles at the factory.

Where PH-20 is not used with PB-21 (PH-20TB):

Step 1: Lay out the parts to be sure they are all there.

Step 2: Place washers over through-bolts.

Step 3: Align pull with holes in door stile.

Step 4: Insert through-bolts into holes in stiles from exterior of door.

Step 5: Tighten bolts into pull.

Where PH-20 is used with PB-21 (PH-20/PB-21):

Step 1: Lay out the parts to be sure they are all there.

Step 2: Align PH-20 with top hole on exterior of door.

Step 3: Insert through-bolt stud from interior of door through top hole into PH-20.

Step 4: Place washer on 1/4" diameter through-bolts.

Step 5: Insert through-bolt from interior through bottom hole into PH-20.

PH-20BTB back-to-back pulls:

Step 1: Lay out the parts to be sure they are all there.

Step 2: Align pull with holes on exterior of door.

Step 3: Insert through-bolt stud from interior of door through top hole into pull.

Step 4: Insert through-bolt stud from interior of door through bottom hole into pull.

Step 5: Loosen setscrews in push.

Step 6: Place push over studs and tighten setscrews.

Wire Pull Replacement for PH-10 shipped with studs for use in pre-existing riv-nuts.

Step 1: Lay out the parts to be sure they are all there.

Step 2: Remove existing PH-10.

Step 3: Install studs into existing riv-nuts.

Step 4: Back out setscrews in replacement pull handle.

Step 5: Align replacement pull handle over studs.

Step 6: Tighten setscrews.

29

MAY 2012

D O O R & F R A M E

I N S T A L L A T I O N M A N U A L

Web Address: www.oldcastlebe.com

Phone: 1-866-OLDCASTLE (653-2278)

Advertising
This manual is related to the following products: