installation manual

2. Closing stop valve

1.

2.

Remove the cap and turn the valve clockwise with the
hexagon wrench.

Securely tighten the valve until the shaft contacts the
main bodyseal.

Make sure to tighten the cap securely.
For the tightening torque, refer to the table below.

Table 7-3

Tightening torque N M (Turn clockwise to close)

Stop

Valve size

Shaft (valve body)

Cap

(Valve lid)

Ø6.4

Hexagonal

wrench 4 mm

Ш9.5

Ш12.7

Ш15.9

Hexagonal

wrench 6 mm

Hexagonal

wrench 6 mm

Ø19.1

Maintenance nut

35~40

23~27

18~22

13.5~16.5

5~7

7~9

9~11

11~13

11.5~13.9

Additional Refrigerant Charge

7.2

Refrigerant cannot be charged until field wiring has been
completed.

Refrigerant may only be charged after performing the leak
test and the vacuum pumping.

When charging a system, care shall be taken that its
maximum permissible charge is never exceeded, in view of
the danger of liquid hammer.

Charging with an unsuitable substance may cause
explosions and accidents, so always ensure that the
appropriate refrigerant is charged.

Refrigerant containers shall be opened slowly.

Always use protective gloves and protect your eyes when
charging refrigerant.

NOTE

CAUTION

If a negative result is gotten for R from Table 7-4, no
refrigerant needs to be added nor removed.

Additional refrigerant will be twice of R from Table 7-4 if
the indoor unit installed throttle assembly.

The outdoor unit is factory charged with refrigerant. Calculate
the added refrigerant according to the diameter and the
length of the liquid side pipe of the outdoor unit/indoor unit
connection.(

suitable for throttle outdoor unit)

1

2

4

3

5

6

Fig.7-9

Using the vacuum pump

Loosen and remove the maintenance nuts of stop valves A
and B, and connect the charge hose of the manifold valve to
the service port of stop valve A. (Be sure that stop valves A
and B are both closed)

Connect the joint of the charge hose with the vacuum pump.

Open the Lo-lever of the manifold value completely.

Turn on the vacuum pump. At the beginning of pumping,
loosen the maintenance nut of stop valve B a little to check
whether the air comes in (the sound of the pump changes,
and the indicator of compound meter turns below zero). Then
fasten the maintenace nut.

When the pumping has finished, close the Lo-lever of the
manifold valve completely and turn off the vacuum
pump.Make pumping for 15 minutes or more and check that
the compound meter indicates -76cmHg(-1X10 Pa)

Loosen and remove the cap of stop valves A and B to open
stop valve A and B completely, then fasten the cap.

Disassemble the charge hose from the service port of stop
valve A, and fasten the nut.

5

7

Fig.7-8

Fig.7-7

Always use a charge hose for service port connection
After tightening the cap, check that no refrigerant leaks
arepresent.

service port

cap

maintenance nut

Stop valve

Gas side

Liquid side

hexagon hole

shaft

seal

Outdoor

unit

Indoor

unit

A

C

D

B

CAUTION

Pressure meter

Multi-meter

-76 cmHg

Lo-lever

Lo-lever

Charge hose

Charge hose

Vacuum pump

Hi-lever

Manifold valve

8. CONNECT THE DRAIN PIPE

Install the drainpipe of the indoor unit

The outlet has PTI screw bread, Please use sealing materials
and pipe sheath(fitting) when connecting PVC pipes.

Table 7-4

Brass tube(mm)

R410A R22

Ш6.35

Ш9.53

Ш12.7

Ш15.9

Ш19.0

0.022kg/m×(L-5)

0.011kg/m×(L-5)

0.060kg/m×(L-5)

0.030kg/m×(L-5)

0.110kg/m×(L-5)

0.060kg/m×(L-5)

0.170kg/m×(L-5)

0.085kg/m×(L-5)

0.250kg/m×(L-5)

0.125kg/m×(L-5)

0.030kg/m×(L-5)

0.015kg/m×L

0.065kg/m×(L-5)

0.030kg/m×L

0.115kg/m×(L-5)

0.060kg/m×L

0.190kg/m×(L-5)

0.095kg/m×L

0.290kg/m×(L-5)

0.145kg/m×L

orifice in the indoorunit

orifice in the outdoorunit

orifice in the outdoorunit

orifice in the outdoorunit

orifice in the outdoorunit

orifice in the outdoorunit

orifice in the indoorunit

orifice in the indoorunit

orifice in the indoorunit

orifice in the indoorunit

NOTE:The number of bends is up to the length of the max
height drop.Usually for each 10m need a bend.

NOTE:the table above refer to the liquid tube.

Advertising
This manual is related to the following products: