8 fuse replacement, 9 battery replacement, 10 parts kit contents – Rice Lake 920i Installation Manual V3.12 User Manual

Page 21

Advertising
background image

Installation

15

2.8

Fuse Replacement

Fuses for the universal and deep enclosure models of

the

920i

are located under a cover plate on the outside

of the enclosure. Remove the cover plate, replace the

fuses, and reinstall the cover plate (see Figure 2-13).

To protect against the risk of fire, replace
fuses only with same type and rating fuse.

See Section 10.14 on page 124 for

complete fuse specifications.

Interface board and fuse access cover
plates must be in place for use in NEMA
4X/IP66 applications.

l

Figure 2-13. Interface Board and Fuse Locations,

Universal Model

2.9

Battery Replacement

The lithium battery on the CPU board maintains the

real-time clock and protects data stored in the system

RAM when the indicator is not connected to AC

power.
Data protected by the CPU board battery includes

time and date, truck and tare memory, onboard

database information, and setpoint configuration.
Use

iRev

to store a copy of the indicator configuration

on a PC before attempting battery replacement. If any

data is lost, the indicator configuration can be restored

from the PC.

NOTE: Memory option card data is also protected by a
lithium battery. All database information stored on a memory
card is lost if the memory card battery fails.

Watch for the low battery warning on the LCD display

and periodically check the battery voltage on both the

CPU board and on any installed memory option cards.

Batteries should be replaced when the indicator low

battery warning comes on, or when battery voltage

falls to 2.2 VDC. Life expectancy of the battery is ten

years.

Replacement Procedure

Before replacing the battery, place the indicator in

setup mode, then press

S AV E / E X I T

to save

battery-backed memory (NVRAM) to flash. This

operation saves the latest configuration information,

including setpoint values, stored strings and data, and

the onboard database, to flash memory.
Return to weigh mode, power off the indicator, and

replace the battery. Use care not to bend the battery

retaining spring.
When power is restored, a message is shown stating

that battery-backed memory is corrupt. Press

ENTER

to restore the values saved in flash memory.
See Figure 2-5 on page 11 for CPU board battery

location and orientation (positive side up).

Risk of explosion if battery is replaced
with incorrect type. Dispose of batteries
per manufacturer instruction.

2.10 Parts Kit Contents

Table 2-6 lists the parts kit contents for the universal

model of the

920i

.

Torque fuse and interface board access covers to

8 in-lb (0.90 N-m)

Interface Board

Power Switch

PN

Description

14626

Kep nuts, 8-32NC (4)

14862

Machine screws, 8-32NC x 3/8 (12)

75068

Sealing washers (14)

15133

Lock washers, No. 8, Type A (4)

30623

Machine screws, 8-32NC x 7/16 (2)

15631

Cable ties (4–single A/D, 6–dual A/D)

15665

Reducing glands for 1/2 NPT cord grips (2)

15887

6-position screw terminal for load cell
connection (1–single A/D, 2–dual A/D)

19538

Cord grip plugs (4–single A/D, 3–dual A/D)

42350

Capacity label (1–single A/D, 2–dual A/D)

53075

Cable shield ground clamps (4)

70599

6-position screw terminals for J2 and J10 (2)

71126

4-position screw terminal for J9 and optional
keyboard connection (2)

71125

3-position screw terminal for J11 (1)

42149

Rubber feet for tilt stand (4)

15144

Nylon washers for tilt stand, 1/4 x 1 x 1/16 (2,
universal model only)

68403

Wing knobs for tilt stand (2)

Table 2-6. Parts Kit Contents

Advertising