Standard installation of the Benchmark

LP floor scale consists of the following steps:

Select a site

Check levelness and smoothness of site

Unpack scale

Adjust the four feet on the scale

Connect cable to summing board and indicator

Calibrate the unit

2.1

Site Preparation

The scale must not be loaded beyond its capacity, even momentarily. Do not select a site where overweight loads

would have to maneuver to avoid crossing the platform. Avoid areas where the scale might receive damaging side

impacts from wheels or forklift tines, or shock damage from falling objects. Avoid areas where water may damage

the scale.
The interface cable between the scale and the indicator must be protected against crushing, cutting, or moisture

damage. If the chosen site has such potential dangers, some method of protection, such as running the cable in

conduit, will be necessary.

In operation, the scale must be level within

1

/

4

inch. Either choose a site where the floor is close to this standard to

avoid excessive shimming, or modify the floor at the chosen site to meet this standard.

2.2

Unpacking and Assembly

1. Remove all packing material and inspect scale for visible damage caused during shipment.
2. Remove the four overload stops on the underside of the scale, shown in Figure 2-1.

Overload
Stops

Overload
Stops

Figure 2-1. Overload Stops to be Removed (4)

3. Remove the black scale cover.
4. Remove the summing board cover in the center of the scale.
5. Wire the homerun cable. Refer to instructions in Section 2.3 on page 4.
6. Properly secure the cable with nylon ties (supplied).
7. Using the bubble level next to the summing board, ensure the scale is level.
8. Replace the black scale cover and use the four mounting screws to secure it in place.
9. If necessary, perform a corner correction. See Section 3.2 on page 6.
10. Replace the summing board cover.
11. Replace the black center cover.
12. Set the stainless steel cover on the scale.