Rice Lake BenchMark LP User Manual

Page 9

Advertising
background image

Installation

5

Cable Routing

The cable must be routed to the indicator in a manner that will protect the cable from damage. When planning cable

routing, leave a loose coil of excess cable under the scale to facilitate future lifting of the scale for servicing or

cleaning.

1. When the interface cable is protected and in its final position, complete connections to the indicator. See

indicator installation manual for wiring information.

2. If necessary, trim corners as described in Section 3.2 on page 6.
3. Check all strain relief for tightness.

Figure 2-4. Homerun Cable Wired to Summing Board and Secured With Nylon Ties

Advertising