Rice Lake Ishida IGX & IGB Series - Operation Manual User Manual
Page 10
1.4 Start and Stop of Operation
IGX/IGB Series Operation Manual No. 0202A
page 7
1
BEFORE OPERA
T
ING
MACHINE
1.4 START AND STOP OF OPERATION
This section explains how to start and stop the machine operation.
Starting Machine Operation
1
Make sure that nothing is placed on the weigh platter.
2
Press the ON/OFF key to turn on the power. Then, the self-diagnostic display appears and
all display segments are lit.
IGX Series
IGB Series
Ä
Make sure that the initial display appears and the “ZERO” indicator lights.
3
IGX Series
IGB Series
NOTE
If the “ZERO” indicator is not lit, press the ZERO key.
Stopping Machine Operation
1
Press the ON/OFF key to stop the machine operation.
IGX Series
IGB Series
Ä
NOTE
When the scale has not been used for a long time, the scale will be automatically turned off.