Load Cell Replacement

13

5.0

Load Cell Replacement

5.1

Replacement Procedure

1. Position jack beneath one of the weighbridge’s main frame members close to the load cell mount. (Allow

room for load cell removal and installation.) Raise jack approximately 1/2" and put setting block(s) under
the scale deck.

CAUTION

As a safety precaution, always use setting blocks when jacking scale module.

2. Disconnect the load cell terminal connections in the junction box.

3. Disconnect the flex conduit from the rigid conduit at the frame.

Load

Cell

Load Cell Bolts

Link

Baseplate

Note

Attach a pull cord to the load cell cable at the j-box before pulling the cable through the conduit.

Figure 5-1. Load Cell Replacement

4. Pull the load cell cable out of the conduit.

5. Remove the two load cell bolts and lift out load cell and link assembly.

6. Remove 90° conduit connector and flex cable. Install 90° conduit connector and flex conduit on new load

cell in the same position as was removed.

7. Install link over new load cell. Reinstall load cell and link assembly onto the baseplate. Install load cell

mount bolts and torque to 50 – 75 ft-lb.

8. Pull load cell cable through conduit using pull cord. Make a loop in flex conduit between the load cell and

the rigid conduit. Reconnect flex conduit to rigid conduit.

9. Remove setting blocks and lower scale module so that it rests on the link. Check link to verify that it is

centered and plum.

10. Connect wiring to terminals in junction box.

Note

RLWS has 1/4" (PN 67293), 1/8" (PN 67294) and 1/16" (PN 67291) shims available to level scale. Do not exceed
over 3/4" of shims combined. If more is necessary, contact RLWS for other options.