2 setup – Rice Lake SURVIVOR ATV User Manual

Page 9

Advertising
background image

Shipping Bolt

Figure 2-3. Pin and Receptacle Interface

Figure 2-4. Two Self-Contained Module Connection

(No Bridge Module)

Assembly

5

2.2

Setup

1. Back off shipping bolts located on ends of weighbridges (four for each self-contained module) until each

bolt is no longer inserted in the scale (see Figure 2-5).

Figure 2-5. Weighbridge Shipping Bolts

2. Remove the bolt which connects the stand to bulkhead base (see Figure 2). Re-install this bolt in the

bulkhead base after the stand is raised in Step 4.

Figure 2-6. Bolt Connecting Stand to Bulkhead

Figure 2-7. Hitch Pin and Chain

Stand/Bulkhead

Connection

Bolt

Pin

Chain

3. Install jack under corner of scale and remove weight of scale from stand located in load cell pocket.

4. Remove hitch pin that holds the stand up (see Figure 2).

5. Lift stand up with chain located inside load cell pocket (See Figure 2).

6. Re-install the bolt and hitch pin previously removed, and the stand will hold in the retracted position.

7. Slowly lower weighbridge onto load cell link and remove jack. Repeat for all load cell pockets.

8. Connect expansion cable between J-boxes on self-contained modules.

9. Wire home run cable and indicator.

10. Apply anti-seize compound to bolt threads and install load cell cover plates.

11. Install bolt-on wings (shipped on pallet). See Figure 2-8.

Advertising