Carrier 69NT40-511-199 User Manual

Page 57

Advertising
background image

SECT

IO

N

3

3-19

T-268-07

c. Auto Test Operation From Serial

Communications

Pre-trip may also be initiated via communications. The

operation is the same as for the Auto Test mode
described above except that should a test fail, the
pre-trip mode will automatically terminate. When
initiated via communications, a test may not be
interrupted with an arrow key, but the pre-trip mode can

be terminated with the PRE-TRIP key.

d. Pre-Trip Test Results

At the end of the pre-trip test selection menu, the

message “P,” “rSLts” will be displayed. Pressing the
ENTER key will allow the user to see the results for all
subtests (i.e., 1-0, 1-1, etc). The results will be displayed
as “PASS” or “FAIL” for all the tests run to completion
since power up. If a test has not been run since power up,

“----------” will be displayed.

3.2.2

Pre-Trip Mode

Table 3-5. Pre-Trip Test Codes

CODE

#

TITLE

DESCRIPTION

NOTE

“Auto” or “Auto1” menu includes the following: P, P1, P2, P3, P4, P5, P6 and rSLts. “Auto2’ (Optional)

menu includes the following: P, P1, P2, P3, P4, P5, P6,P7, P8, P9, P10 and rSLts. (Refer to section 3.2.1.)

P

Pre-Trip Initiated

All lights and display segments will be energized for five seconds at the start of

the pre-trip. Since the unit cannot recognize lights and display failures, there are

no test codes or results associated with this phase of pre-trip.

P1-0 Heaters Turned On

Setup: Heater must start in the OFF condition, and then be turned on. A current

draw test is done after 15 seconds.

Pass/Fail Criteria: Passes if change in current draw is within the range

specified.

P1-1 Heaters Turned Off

Setup: Heater must start in the ON condition, and then be turned off. A current

draw test is done after 10 seconds.

Pass/Fail Criteria: Passes if change in current draw is within the range

specified.

P2-0 Condenser Fan On

Requirements: Water pressure switch (WP) input must be closed.

Setup: Condenser fan is turned ON, a current draw test is done after 15

seconds.

Pass/Fail Criteria: Passes if change in current draw test is within the range

specified.

P2-1 Condenser Fan Off

Setup: Condenser fan is turned OFF, a current draw test is done after 10

seconds.

Pass/Fail Criteria: Passes if change in current draw test is within the range

specified.

P3

Low Speed

Evaporator Fans

Requirements: The unit must be equipped with a low speed evaporator fan, as

determined by the Evaporator Fan speed select configuration variable.

NOTE: If the unit is configured for single evaporator fan operation, Pre-Trip tests

P3-0, P3-1, P4-0 and P4-1 will fail immediately if Controller alarm codes AL11 or

AL12 are active at the start of testing.

P3-0

Low Speed

Evaporator Fan

Motors On

Setup: The high speed evaporator fans will be turned on for 10 seconds, then off

for two seconds, then the low speed evaporator fans are turned on. A current

draw test is done after 60 seconds.

Pass/Fail Criteria: Passes if change in current draw is within the range

specified. Fails if AL11 or AL12 activates during test.

P3-1

Low Speed

Evaporator Fan

Motors Off

Setup: The low speed Evaporator Fan is turned off, a current draw test is done

after 10 seconds.

Pass/Fail Criteria: Passes if change in current draw is within the range

specified. Fails if AL11 or AL12 activates during test.

P4-0

High Speed

Evaporator Fan

Motors On

Setup: The high speed Evaporator Fan is turned on, a current draw test is done

after 60 seconds.

Pass/Fail Criteria: Passes if change in current draw is within the range

specified. Fails if AL11 or AL12 activates during test.