2 ecs wiring connections to xpc port 1a, Gf-122 aerco xpc gateway – AERCO XPC GATEWAY Communications User Manual

Page 71

Advertising
background image

GF-122 AERCO XPC GATEWAY

71

(a) Connect the “HF” terminal to the “NET +” terminal of Port 2 on the XPC

(b) Connect the “HE” terminal to the “NET -” terminal of Port 2 on the XPC.

2W

4W

232

Net +

Net -

N/C

N/C

Tx +

Tx

Tx -

Rx

DTR

Rx - DCD

SIGNAL

GROUND

Rx +

Port 2

PART OF

EUROTHERM 2408

REAR CONNECTOR

XPC GATEWAY

HD

HE

HF

SHIEL

D

BLUE

(-)

RE

D (+

)

S

H

IE

L

D

TIE TOGETHER WITH

SHIELDS OF OTHER

UNITS

DAISY-CHAIN

TO OTHER UNITS

(

+

TO

+

,

-

TO

-)

BLUE (-)

RED

(+)

R

ED (

+

)

BL

UE (-

)

Figure 5-6. XPC Port 2 Connections to ECS Temperature Controller

3. On the XPC Gateway, check to ensure that DIP switch 3 is set to the OFF position.

5.2.2 ECS Wiring Connections to XPC Port 1a

When the controlling BAS is connected to Port 2 and is using a LonWorks SLTA or communicating via
BACnet PTP, connect the ECS to XPC Port 1a as follows:

NOTE

The positions of the EIA-232/EIA-485 and 2W/4W jumpers will depend on
the available ports on the controlling BAS being used.

1. Connect ECS terminals HE and HF to XPC Port 1a (Figure 5-7) as follows:

(a) Connect the “HF” terminal to the “NET +” terminal of Port 1a on the XPC

(b) Connect the “HE” terminal to the “NET -” terminal of Port 1a on the XPC.

PART OF

EUROTHERM 2408

REAR CONNECTOR

HD

HE

HF

Net +

Net -

Shield

P

O

RT

1a

XPC GATEWAY

SHIELD

BLUE (-)

RED (

+)

BLUE (-)

RED (

+)

S

H

IE

L

D

TIE TOGETHER WITH

SHIELDS OF OTHER

UNITS

RE

D (+

)

BL

UE (-

)

DAISY-CHAIN

TO OTHER UNITS

(

+

TO

+

,

-

TO

-)

Advertising